Set a layer status
Add a short status and progress marker beneath a layer in the navigator.
Updated 1 min read
A layer status lets collaborators see whether work is active, blocked, under review, or done. Set it from a terminal on that layer.
Update the status
- Open a terminal on the layer whose status you want to change.
- Run
mao layer statuswith a state, for examplemao layer status --state review. - Add a progress fraction with
--progress 3/5if useful, or use--clearto remove the status. - Reopen the navigator to see the status beneath the layer.
NoteAvailable states are
working, blocked, review, and done. You can include a one-line status message.LimitChanging another layer’s status requires Orchestrator access.
blocked and review mark the layer as needing attention.Something missing or wrong? Ask in the Discord or write to hello@miguer.com.